Site Preparation: Ensure the subbase is clean, level, and moisture-free.
Subfloor Assembly: Lay interlocking panels, aligning grooves for a seamless fit.
Shock Pad Placement: Install rubber mats between subfloor and hardwood.
Hardwood Installation: Use a pneumatic nailer to secure maple planks, maintaining 1/16" expansion gaps.
Finishing: Sand, seal, and apply a polyurethane coat with non-slip additives.
Line Marking: Use precision stencils for court boundaries and three-point arcs.
Total time: 2–3 days for a standard NCAA-sized court.
Step-by-Step Guide to Installing a Portable Basketball Wood Floor
·

Leave a Reply